Brownfield – Articles, images, inspiration
Battersea Power Station Redevelopment
In June 2008, architect Rafael Vinoly has unveiled plans for the redevelopment of Battersea Power Station in London. The proposal, for developer Treasury Holdings, includes a 300 meter high tower and an ‘Eco-Dome’.In December the firm were forced to reduce the height of the chimney by 50m amidst strong objections... Read more »
Exchanger Station, Varnsdorf
The object served originally as the exchanger station of heat management of the town Varnsdorf. The proposed building adjustments of the object lead to the creation of new commercial spaces – shops. The design of the architectonic form is selected taking account of the form of... Read more »
Reconstruction and completion of construction of the former depot
Prague 7 - Stromovka The reconstructed object was a part of the area of tram stop with shed and depot in Stromovka. The construction was completed in 1899 and in 1910 the building of the dispatch shed with the flat of the head locksmith was rebuilt. Since that time its form... Read more »
Reconstruction and addition of the area of the company AF BKK s.r.o.
Prague, The area goes through gradual complex renovation. In 2006 complete reconstruction was completed of the neighbouring smaller object and the whole area is being repaired continuously, during operation and according to the needs of the printing office (owner of the area). This... Read more »
Wine Bar, Prague 1
We originally did not plan on the old courtyard factory being part of the space of the site for our new company Design by Donlic. The rooms on the ground floor of the building with a volume of approximately 300 square metres were sufficient. Our activity, however, gradually developed... Read more »
Holešovické mlýny (Holešovice Mills)– Classic 7, Prague 7
Almost every architect dreams of measuring his or her strengths and skills with a project involving the reconstruction and revitalisation of such a fantastic industrial structure. Whether that architecture be planned or random, it at present symbolises the classic beauty and poetry... Read more »
Neo-gothic brewery in Nová Paka
A neo-gothic building of a brewery in Nová Páka, which was built in 1871, has its original appearance. Recently it has been constructed and modernized. The interiors of all the buildings have been repaired and a restaurant was built in the space of the former digester house. The most... Read more »
There will be new flats built from the former brewery
The new owner of the area of the former brewery in Braník is ING Real Estate company which is probably planning building residential units here, complemented by retail areas and other services. T.Johánek Source: Development News Read more »
The former factory is to expect an change
The zone with shops, residential units and offices should in the next few years develop in place of the former tanning factory Svit in Velké Meziříčí at Vysočina. These are the plans of the owner of the vacated spaces which after the public auction are the CPI Group. T.Johánek... Read more »
Industrial area will offer offices and residential units
For example the industrial area of the former Tatra Smíchov underwent its regeneration long ago and during last year considerably changed its appearance, the Modřany area of the former Orion factory on the opposite bank of the river was waiting for this opportunity for a long time.... Read more »